Connecting the house to the power grid, water supply, sewerage and gas

We do not help with this service, the page has been archived, but the information that is outdated for us may be useful for you.

Erecting walls, installing the roof and finishing works do not yet make a property residential; for that, a stage such as connecting the house to the power grid, water supply, central sewerage and gas is necessary. Only after this can occupants move in. At the same time, connection to some of these networks is also necessary for industrial buildings.

The process of connecting to utilities is quite lengthy; it requires visiting various authorities with a multitude of documents. It should be taken into account that electricity, water and gas are managed by different organizations, although the course of action is almost the same everywhere.

How to connect to sewerage, the water supply and other utilities

First, you need to obtain the technical specifications, for which you must apply to the relevant utility company with a statement, to which a document confirming your rights to the land plot must be attached. The document production time may be delayed, and you may have to inquire several times about the status of your application. After receiving the technical specifications, you must prepare the project and have it approved. This can only be entrusted to an organization that has a license.

Installation works will be carried out according to the project. The contractor must also have a valid license for this type of activity. Upon completion of the connection, the results must be evaluated by the utility company with which a contract for water supply and wastewater disposal, as well as for connection to the gas pipeline and the power grid, will subsequently be concluded.

Our company will help you prepare the necessary package of documents; we will also help you choose contractors who have all the licenses and permits, and who perform the work quickly and, most importantly, to a high standard. We will take on the process of processing documents with the utility companies, which will significantly reduce the time needed for approving documents, issuing permits, arranging the contract and acceptance of the work.

Nakaz UA
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.